Clossure 3 of 3.
The MLC is pleased to advise that the Spring 2026 works to Bevill’s Leam Pumping Station have been successfully completed. Water levels are returning to normal summer retention levels and Lodes End Lock will be re-opened today to enable the navigable waterways to the West of the lock to be accessible from 16th May 2026.
There is a further overhaul of the fourth of six pumps at Bevill’s Leam Pumping Station planned for Spring 2027, so a similar closure will take place next year.